North Sulawesi Additional Study (Site Kema-Lolak)

  • Home
  • North Sulawesi Additional Study (Site Kema-Lolak)
  • Project Name North Sulawesi Additional Study (Site Kema-Lolak)
  • Project Type Renewable Energy Study
  • Client PT Amitara Energi Indonesia
  • Completion Date 02/09/2022

CASE STUDY

PT Amitara Energi Indonesia plans to develop some PV Farm projects in Northern Sulawesi (Sulutgo) system. These PV farms will be equipped with battery energy storage system (BESS). Thus, an in-depth technical study will be needed to make sure the PV Farm and the BESS interconnection can be done without giving any negative impact to the Sulutgo system stability. By conducting the study, we will be able to assess the feasibility of the PV farm and BESS interconnection from the electrical aspect and technical aspect.

DELIVERABLES

To assess existing grid condition including its supply and demand, verify the PV and BESS sizing in fulfilling its function, and analyze the impact of the additional power plant (PV+BESS) interconnection to the system.