150 kV Wotu Grid Assesment

  • Home
  • 150 kV Wotu Grid Assesment
  • Project Name 150 kV Wotu Grid Assesment
  • Project Type Renewable Energy Study
  • Client PT Berkeley Energy Indonesia
  • Completion Date 12/02/2021

CASE STUDY

Electricity is one of energy that is easiest to transfer, most efficient, and most used in the world. Therefore, electricity demand is increasing each year. To meet the growing electricity demand, power plant and its transmission line must be built. Renewable energy is energy that is collected from renewable resources, which are naturally replenished on a human timescale, such as utilizing wind speed, solar power, and hydropower. However, in Indonesia renewable energy power generation has grown as a result of clean energy policies. One of the fastest growing of these green energy sources is solar power.

DELIVERABLES

To confirm the suitability of the planned connection point and to determine the capability of Wotu PV Farm and PLN network from static and dynamic analysis perspective.